Total amount
2.3 millones de pesos mexicanos (2,284,217.44 MXN)
Contract period(s)
Between 8 de julio de 2015 and 15 de septiembre de 2015This contract is part of a record. See record ocds-0ud2q6-XX-828038990-X5-2015 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
DIRECCION DE OBRAS PUBLICAS Y DESARROLLO URBANO (Code: 828038990 )
Licitación Pública (open)
Regulations: 08. Reporte de otras contrataciones y contrataciones con crédito externo
Submission methods:
inPerson
Call status
complete
Call title
PCH CALLE LOMA ESCONDIDA
Award title
PAVIMENTACIÓN DE CONCRETO HIDRAULICO Y OBRA HIDROSANITARIA DE LA CALLE LOMA ESCONDIDA ENTRE BLVD. LOMA REAL Y LOMA DEL CHAIREL, COL. JESÚS ELÍAS PIÑA
Contract title
PAVIMENTACIÓN DE CONCRETO HIDRAULICO Y OBRA HIDROSANITARIA DE LA CALLE LOMA ESCONDIDA ENTRE BLVD. LOMA REAL Y LOMA DEL CHAIREL, COL. JESÚS ELÍAS PIÑA
Supplier(s)
Amount
2.3 millones de pesos mexicanos (2,284,217.44 MXN)
Signature date
7 de julio de 2015
Execution period
8 de julio de 2015 to 15 de septiembre de 2015
Internal award code
776835
No data
Date updated in QQW
24 de enero de 2019
Source(s)
Part of the project
Organization responsible for the import