Total amount
9.8 millones de pesos mexicanos (9,805,744.74 MXN)
Contract period(s)
Between 31 de diciembre de 2010 and 30 de marzo de 2011This contract is part of a record. See record ocds-0ud2q6-SO-919009986-N277-2012 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Secretaría de Infraestructura (Code: 919009986 )
Adjudicación Directa Federal (direct)
Regulations: Z15122015 24. Adjudicación Directa Nacional Simplificada LOPSRM
Submission methods:
inPerson
Call status
complete
Call title
RECONSTRUCCIÓN DE PUENTE, COLONIA EL CIRCULO, MTY, N.L.
Award title
RECONSTRUCCIÓN DE PUENTE, CAMINO AL CIRCULO SOBRE ARROYO LA CHUECA, COLONIA EL CIRCULO, MONTERREY, NUEVO LEÓN
Contract title
RECONSTRUCCIÓN DE PUENTE, CAMINO AL CIRCULO SOBRE ARROYO LA CHUECA, COLONIA EL CIRCULO, MONTERREY, NUEVO LEÓN
Supplier(s)
Amount
9.8 millones de pesos mexicanos (9,805,744.74 MXN)
Execution period
31 de diciembre de 2010 to 30 de marzo de 2011
Internal award code
215635
No data
Date updated in QQW
8 de noviembre de 2019
Source(s)
Part of the project
Organization responsible for the import