Total amount
2.4 millones de pesos mexicanos (2,394,880 MXN)
Contract period(s)
Between 26 de enero de 2012 and 26 de enero de 2012This contract is part of a record. See record ocds-0ud2q6-OS-5725/12 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Call status
complete
Call title
ESTUDIO DE MANIOBRABILIDAD INTEGRAL DEL PUERTO DE ALTAMIRA. BAJO CONTRATO APIALT-RM-036/11 SEGUN SEÑALA EN LA CLAUSULA OCTAVA LA REALIZACION DE UN SEGUNDO PAGO POR EL 30% Y UN TERCER PAGO POR EL 50% DE LOS SERVICIOS CORRESPONDIENTE AL AÑO 2012.
Award title
ESTUDIO DE MANIOBRABILIDAD INTEGRAL DEL PUERTO DE ALTAMIRA. BAJO CONTRATO APIALT-RM-036/11 SEGUN SEÑALA EN LA CLAUSULA OCTAVA LA REALIZACION DE UN SEGUNDO PAGO POR EL 30% Y UN TERCER PAGO POR EL 50% DE LOS SERVICIOS CORRESPONDIENTE AL AÑO 2012.
Contract title
ESTUDIO DE MANIOBRABILIDAD INTEGRAL DEL PUERTO DE ALTAMIRA. BAJO CONTRATO APIALT-RM-036/11 SEGUN SEÑALA EN LA CLAUSULA OCTAVA LA REALIZACION DE UN SEGUNDO PAGO POR EL 30% Y UN TERCER PAGO POR EL 50% DE LOS SERVICIOS CORRESPONDIENTE AL AÑO 2012.
Supplier(s)
Amount
2.4 millones de pesos mexicanos (2,394,880 MXN)
Signature date
26 de enero de 2012
Execution period
26 de enero de 2012 to 26 de enero de 2012
Internal award code
OS-5725/12
No data
Date updated in QQW
9 de mayo de 2021
Part of the project
Organization responsible for the import