PAVIMENTACION AV INDEPENDENCIA 1a ETAPA

CONTRACT SUMMARY LO-821176798-E2-2018-1764861

Total amount

4.3 millones de pesos mexicanos (4,304,504.55 MXN)

Contract period(s)

Between 4 de abril de 2018 and 1 de agosto de 2018

Description

PAVIMENTACION CON CONCRETO HIDRAULICO DE AVENIDA INDEPENDENCIA TRAMO RIJO-TILAPA PRIMERA ETAPA EN LA LOCALIDAD DE TILAPA

This contract is part of a record. See record ocds-0ud2q6-LO-821176798-E2-2018 in Open Contracting Data Standard format.

CONTRACT QUALITY

More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.

This contract has not been evaluated.

PLANNING

Project: FORTALEC FINANCIERO (23U130)

CALL FOR TENDERS

Buying unit

MUNICIPIO DE TILAPA (Code: 821176798 )

Call type

Licitación Pública (open)

Regulations: 02. Licitación Pública LOPSRM

Scope

Nacional

Purchase type

Obra Pública (works)

Submission methods:

inPerson

Call period:

23 de marzo de 2018 - 3 de abril de 2018

Call status

complete

AWARD AND CONTRACT

Call title

PAVIMENTACION AV INDEPENDENCIA 1a ETAPA

Award title

PAVIMENTACION AV INDEPENDENCIA 1a ETAPA

Contract title

PAVIMENTACION AV INDEPENDENCIA 1a ETAPA

Supplier(s)

ROBERTO CRUZ RAMIRO

Amount

4.3 millones de pesos mexicanos (4,304,504.55 MXN)

Award decision date

4 de abril de 2018

Signature date

4 de abril de 2018

Execution period

4 de abril de 2018 to 1 de agosto de 2018

Internal award code

1764861

This contract is Expirado (terminated) . The contract term has ended.