Total amount
4.3 millones de pesos mexicanos (4,304,504.55 MXN)
Contract period(s)
Between 4 de abril de 2018 and 1 de agosto de 2018Description
PAVIMENTACION CON CONCRETO HIDRAULICO DE AVENIDA INDEPENDENCIA TRAMO RIJO-TILAPA PRIMERA ETAPA EN LA LOCALIDAD DE TILAPA
This contract is part of a record. See record ocds-0ud2q6-LO-821176798-E2-2018 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
MUNICIPIO DE TILAPA (Code: 821176798 )
Submission methods:
inPerson
Call period:
23 de marzo de 2018 - 3 de abril de 2018
Call status
complete
Call title
PAVIMENTACION AV INDEPENDENCIA 1a ETAPA
Award title
PAVIMENTACION AV INDEPENDENCIA 1a ETAPA
Contract title
PAVIMENTACION AV INDEPENDENCIA 1a ETAPA
Supplier(s)
Amount
4.3 millones de pesos mexicanos (4,304,504.55 MXN)
Signature date
4 de abril de 2018
Execution period
4 de abril de 2018 to 1 de agosto de 2018
Internal award code
1764861
No data
Date updated in QQW
11 de septiembre de 2019