Total amount
32.8 millones de pesos mexicanos (32,760,312.21 MXN)
Contract period(s)
Between 31 de julio de 2018 and 10 de diciembre de 2018Description
REHABILITACION DE LOS SISTEMAS DE PRETRATAMIENTO, TRATAMIENTO PRIMARIO, INTERCONEXION ENTRE AMBOS Y PRIMERA ETAPA DEL MODULO DE DESHIDRATADO DE LODOS EN LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES SALAGUA CON CAPACIDAD DE 420 LPS EN MANZANILLO, COLIMA.
Buying unit
Comision de Agua Potable, Drenaje y Alcantarillado de Manzanillo at level municipal in MéxicoThis contract is part of a record. See record ocds-0ud2q6-LO-806007991-E1-2018 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Comision de Agua Potable, Drenaje y Alcantarillado de Manzanillo (Code: 806007991 )
Submission methods:
inPerson
Call period:
12 de julio de 2018 - 25 de julio de 2018
Call status
complete
Call title
REHABILITACION DE LOS SISTEMAS DE PRETRATAMIENTO, TRATAMIENTO PRIMARIO
Award title
REHABILITACION DE LOS SISTEMAS DE PRETRATAMIENTO, TRATAMIENTO PRIMARIO, INTERCONEXION ENTRE AMBOS Y PRIMERA ETAPA DEL MODULO DE DESHIDRATADO DE LODOS EN LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES SALAGUA CON CAPACIDAD DE 420 LPS EN MANZANILLO, COLIMA.
Contract title
REHABILITACION DE LOS SISTEMAS DE PRETRATAMIENTO, TRATAMIENTO PRIMARIO, INTERCONEXION ENTRE AMBOS Y PRIMERA ETAPA DEL MODULO DE DESHIDRATADO DE LODOS EN LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES SALAGUA CON CAPACIDAD DE 420 LPS EN MANZANILLO, COLIMA.
Supplier(s)
CONSTRUCASDA SA DE CV (RFC: CON161222V94)
Amount
32.8 millones de pesos mexicanos (32,760,312.21 MXN)
Execution period
31 de julio de 2018 to 10 de diciembre de 2018
Internal award code
1925201
No data
Date updated in QQW
11 de septiembre de 2019
Source(s)
Part of the project