TRANSPORTE MASIVO TRONCO ALIMENTADOR CORREDOR RIO TIJUANA PUERTA MÉXICO – FLORIDO (PAQUETE 3, CONTRATO 2: HABILITACIÓN DE PARADEROS SOBRE EL TRAZO DE LAS RUTAS PETRONCALES DEL SISTEMA INTEGRAL DE TRANSPORTE DE TIJUANA, B.C.
CONTRACT SUMMARY LO-802004998-N24-2015-897510
Total amount
59.9 millones de pesos mexicanos (59,914,523.18 MXN)
Contract period(s)
Between 12 de octubre de 2015 and 7 de abril de 2016This contract is part of a record.See record ocds-0ud2q6-LO-802004998-N24-2015 in Open Contracting Data Standard format.
CONTRACT QUALITY
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
PLANNING
CALL FOR TENDERS
Dirección de Obras e Infraestructura Urbana Municipal(Code: 802004998)
Submission methods:
Call period:
29 de julio de 2015 - 24 de agosto de 2015
Call status
complete
AWARD AND CONTRACT
Call title
PAQUETE 3 CONTRATO 2: HABILITACIÓN DE PARADEROS SOBRE EL TRAZO DE LAS RUTAS PRET
Award title
TRANSPORTE MASIVO TRONCO ALIMENTADOR CORREDOR RIO TIJUANA PUERTA MÉXICO – FLORIDO (PAQUETE 3, CONTRATO 2: HABILITACIÓN DE PARADEROS SOBRE EL TRAZO DE LAS RUTAS PETRONCALES DEL SISTEMA INTEGRAL DE TRANSPORTE DE TIJUANA, B.C.
Contract title
TRANSPORTE MASIVO TRONCO ALIMENTADOR CORREDOR RIO TIJUANA PUERTA MÉXICO – FLORIDO (PAQUETE 3, CONTRATO 2: HABILITACIÓN DE PARADEROS SOBRE EL TRAZO DE LAS RUTAS PETRONCALES DEL SISTEMA INTEGRAL DE TRANSPORTE DE TIJUANA, B.C.
Supplier(s)
Amount
59.9 millones de pesos mexicanos (59,914,523.18 MXN)
Signature date
2 de octubre de 2015
Execution period
12 de octubre de 2015 to 7 de abril de 2016
Internal award code
897510
This contract has been archived
This is a multi-year contract
IMPLEMENTATION
No data
GENERAL INFORMATION
Date updated in QQW
24 de enero de 2019
Source(s)
Part of the project
Organization responsible for the import