Plan Integral de Mejora de Operación Hidráulica, Sectorización Molino,Ags.

CONTRACT SUMMARY LO-801001996-T47-2013-431440

Total amount

8 millones de pesos mexicanos (7,961,886.77 MXN)

Contract period(s)

Between 26 de noviembre de 2013 and 31 de diciembre de 2013

This contract is part of a record. See record ocds-0ud2q6-LO-801001996-T47-2013 in Open Contracting Data Standard format.

CONTRACT QUALITY

More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.

This contract has not been evaluated.

PLANNING

CALL FOR TENDERS

Buying unit

Licitaciones (Code: 801001996 )

Call type

Licitación Pública (open)

Regulations: Z15122015 17. Licitación Pública Internacional Bajo TLC LOPSRM

Scope

Internacional

Purchase type

Obra Pública (works)

Submission methods:

electronicSubmission

Call period:

10 de octubre de 2013 - 30 de octubre de 2013

Call status

complete

AWARD AND CONTRACT

Call title

Plan Integral de Mejora de Operación Hidráulica, Sectorización Molino.

Award title

Plan Integral de Mejora de Operación Hidráulica, Sectorización Molino,Ags.

Contract title

Plan Integral de Mejora de Operación Hidráulica, Sectorización Molino,Ags.

Amount

8 millones de pesos mexicanos (7,961,886.77 MXN)

Signature date

26 de noviembre de 2013

Execution period

26 de noviembre de 2013 to 31 de diciembre de 2013

Internal award code

431440

This contract is Expirado (terminated) . The contract term has ended.
This contract has been archived

IMPLEMENTATION

No data

GENERAL INFORMATION

Date updated in QQW

24 de enero de 2019

Part of the project

TodosLosContratos.mx

Organization responsible for the import

PODER