Total amount
3.4 millones de pesos mexicanos (3,389,433.16 MXN)
Contract period(s)
Between 17 de octubre de 2018 and 9 de noviembre de 2018Description
TRABAJOS DE OBRA CIVIL, INSTALACIONES ELECTROMECÁNICA Y EQUIPO DE INSTALACIÓN PERMANENTE
This contract is part of a record. See record ocds-0ud2q6-LO-019GYR072-E1-2018 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
00641206 (Code: 050GYR072 )
Submission methods:
electronicSubmission, inPerson
Call period:
15 de marzo de 2018 - 3 de abril de 2018
Call status
complete
Call title
TERMINACIÓN DE LA CONSTRUCCIÓN DE LA UMF 10 CONSULTORIOS
Award title
CONVENIO EN MONTO PARA LA UMF 10 CONSULTORIOS
Contract title
CONVENIO EN MONTO PARA LA UMF 10 CONSULTORIOS
Supplier(s)
GRUPO INMOBILIARIO REAL DEL BOSQUE SA DE CV (RFC: GIR830511T93)
Amount
3.4 millones de pesos mexicanos (3,389,433.16 MXN)
Signature date
17 de octubre de 2018
Execution period
17 de octubre de 2018 to 9 de noviembre de 2018
Internal award code
1957006
No data
Date updated in QQW
11 de septiembre de 2019
Source(s)
Part of the project
Organization responsible for the import