Total amount
6.2 millones de pesos mexicanos (6,179,629.91 MXN)
Contract period(s)
Between 23 de abril de 2012 and 4 de noviembre de 2012This contract is part of a record. See record ocds-0ud2q6-LO-018TOQ071-N10-2012 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Gerencia Regional de Transmisión Peninsular (Code: 018TOQ071 )
Submission methods:
electronicSubmission, inPerson
Call period:
22 de febrero de 2012 - 20 de marzo de 2012
Call status
complete
Call title
CONSTRUCCION ARREGLO DOBLE INTERRUPTOR 230 KV Y ALIMENTADOR 115 KV S.E. TICUL II
Award title
CONSTRUCCION DEL ARREGLO DE DOBLE INTERRUPTOR EN 230 KV Y UN NUEVO ALIMENTADOR DE 115 KV EN SUBESTACION TICUL II, EN EL ÁMBITO DE ZONA DE TRANSMISION YUCATAN, DE LA GERENCIA REGIONAL DE TRANSMISIÓN PENINSULAR, EN EL ESTADO DE YUCATAN, EJERCICIO 2012
Contract title
CONSTRUCCION DEL ARREGLO DE DOBLE INTERRUPTOR EN 230 KV Y UN NUEVO ALIMENTADOR DE 115 KV EN SUBESTACION TICUL II, EN EL ÁMBITO DE ZONA DE TRANSMISION YUCATAN, DE LA GERENCIA REGIONAL DE TRANSMISIÓN PENINSULAR, EN EL ESTADO DE YUCATAN, EJERCICIO 2012
Supplier(s)
Amount
6.2 millones de pesos mexicanos (6,179,629.91 MXN)
Signature date
12 de abril de 2012
Execution period
23 de abril de 2012 to 4 de noviembre de 2012
Internal award code
109486
No data
Date updated in QQW
8 de noviembre de 2019
Source(s)
Part of the project