Total amount
176.7 millones de pesos mexicanos (176,661,382.9 MXN)
Contract period(s)
Between 2 de septiembre de 2013 and 30 de septiembre de 2015This contract is part of a record. See record ocds-0ud2q6-LO-009J3G999-N2-2013 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
This contract has not been evaluated.
This contract has not been evaluated.
Gerencia de Operaciones e Ingeniería (Code: 009J3G999 )
Submission methods:
electronicSubmission
Call period:
2 de julio de 2013 - 18 de julio de 2013
Call status
complete
Call title
CONSTRUCCION MUELLE USOS MULTIPLES - N2-2013
Award title
CONSTRUCCIÓN DE UN MUELLE DE USOS MÚLTIPLES EN EL PUERTO DE SALINA CRUZ, OAXACA
Contract title
CONSTRUCCIÓN DE UN MUELLE DE USOS MÚLTIPLES EN EL PUERTO DE SALINA CRUZ, OAXACA
Amount
176.7 millones de pesos mexicanos (176,661,382.9 MXN)
Signature date
2 de septiembre de 2013
Execution period
2 de septiembre de 2013 to 30 de septiembre de 2015
Internal award code
375962
No data
Date updated in QQW
24 de enero de 2019