Total amount
1.2 millones de pesos mexicanos (1,224,104.4 MXN)
Contract period(s)
Between 30 de agosto de 2018 and 28 de noviembre de 2018Description
10010058671 Y 10010058672 PAVIMENTACION INTEGRAL CON CONCRETO HIDRAULICO EN CALLE CARROCEROS, COL. SANCHEZ TABOADA (PRODUTSA), Y EN CALLE GRANJA EL TECOLOTE, COL. EL TECOLOTE, EN LA CIUDAD DE TIJUANA, B.C. IO-902057985-E35-2018
This contract is part of a record. See record ocds-0ud2q6-IO-902057985-E35-2018 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
SUBDIRECCIÓN DE OBRAS Y PROYECTOS (Code: 902057985 )
Invitación a Cuando Menos 3 Personas (limited)
Regulations: 04. Invitación a Cuando Menos Tres Personas LOPSRM
Submission methods:
inPerson
Call period:
20 de julio de 2018 - 6 de agosto de 2018
Call status
complete
Call title
PAV.INT.CONC.HIDR.COL.S.TABOADA Y COL.EL TECOLOTE,TIJ,BC, IO-902057985-E35-2018
Award title
PAVIMENTACION INTEGRAL CON CONCRETO HIDRAULICO EN CALLE CARROCEROS, COL. SANCHEZ TABOADA (PRODUTSA), Y EN CALLE GRANJA EL TECOLOTE, COL. EL TECOLOTE, EN LA CIUDAD DE TIJUANA, B.C. IO-902057985-E35-2018
Contract title
PAVIMENTACION INTEGRAL CON CONCRETO HIDRAULICO EN CALLE CARROCEROS, COL. SANCHEZ TABOADA (PRODUTSA), Y EN CALLE GRANJA EL TECOLOTE, COL. EL TECOLOTE, EN LA CIUDAD DE TIJUANA, B.C. IO-902057985-E35-2018
Supplier(s)
Amount
1.2 millones de pesos mexicanos (1,224,104.4 MXN)
Execution period
30 de agosto de 2018 to 28 de noviembre de 2018
Internal award code
1902761
No data
Date updated in QQW
11 de septiembre de 2019
Source(s)
Part of the project
Organization responsible for the import