Total amount
1.1 millones de pesos mexicanos (1,085,904.698 MXN)
Contract period(s)
Between 1 de agosto de 2018 and 29 de octubre de 2018Description
PAVIMENTACION CON CONCRETO HIDRAULICO EN LA CALLE 10 DE MAYO DE LA LOCALIDAD DE LA LABOR DE ABAJO (LABOR DE ABAJO Y DE A.) DEL MUNICIPIO DE EL PLATEADO DE JOAQUIN AMARO, ZACATECAS.
This contract is part of a record. See record ocds-0ud2q6-IO-832015992-E3-2018 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
DIRECCIÓN DE DESARROLLO ECONOMICO Y SOCIAL (Code: 832015992 )
Invitación a Cuando Menos 3 Personas (limited)
Regulations: 04. Invitación a Cuando Menos Tres Personas LOPSRM
Submission methods:
inPerson
Call period:
18 de julio de 2018 - 25 de julio de 2018
Call status
complete
Call title
PAVIMENTACION CON CONCRETO HIDRAULICO EN LA CALLE 10 DE MAYO, EN LA LABOR
Award title
PAVIMENTACION CON CONCRETO HIDRAULICO EN LA CALLE 10 DE MAYO, EN LA LABOR
Contract title
PAVIMENTACION CON CONCRETO HIDRAULICO EN LA CALLE 10 DE MAYO, EN LA LABOR
Supplier(s)
Amount
1.1 millones de pesos mexicanos (1,085,904.698 MXN)
Signature date
27 de julio de 2018
Execution period
1 de agosto de 2018 to 29 de octubre de 2018
Internal award code
1885633
No data
Date updated in QQW
11 de septiembre de 2019
Source(s)
Part of the project
Organization responsible for the import