Total amount
3.7 millones de pesos mexicanos (3,676,655.79 MXN)
Contract period(s)
Between 3 de mayo de 2018 and 31 de julio de 2018Description
PAVIMENTACIÓN A BASE DE CONCRETO HIDRAULICO DE LA CALLE SANTOS DEGOLLADO, ENTRE LAS CALLES MELCHOR OCAMPO Y EJE CENTRAL NORTE, DE LA COLONIA SABIANAL, PEROTE, VER.NORTE, DE LA COLONIA SABIANAL, PEROTE, VER.
This contract is part of a record. See record ocds-0ud2q6-IO-830128914-E1-2018 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Dirección de Obras Públicas (Code: 830128914 )
Invitación a Cuando Menos 3 Personas (limited)
Regulations: 04. Invitación a Cuando Menos Tres Personas LOPSRM
Submission methods:
inPerson
Call period:
21 de abril de 2018 - 26 de abril de 2018
Call status
complete
Call title
PAVIMENTACION A BASE DE CONCRETO HIDRAULICO DE LA CALLE SANTOS DEGOLLADO
Award title
PAVIMENTACION A BASE DE CONCRETO HIDRAULICO DE LA CALLE SANTOS DEGOLLADO, ENTRE LAS CALLES MELCHOR OCAMPO Y EJE CENTRAL NORTE, DE LA COLONIA SABIANAL, PEROTE, VER.
Contract title
PAVIMENTACION A BASE DE CONCRETO HIDRAULICO DE LA CALLE SANTOS DEGOLLADO, ENTRE LAS CALLES MELCHOR OCAMPO Y EJE CENTRAL NORTE, DE LA COLONIA SABIANAL, PEROTE, VER.
Supplier(s)
Amount
3.7 millones de pesos mexicanos (3,676,655.79 MXN)
Execution period
3 de mayo de 2018 to 31 de julio de 2018
Internal award code
1800062
No data
Date updated in QQW
11 de septiembre de 2019
Source(s)
Part of the project
Organization responsible for the import