CO-K-664-209F/2017

CONTRACT SUMMARY IO-827004998-E156-2017-1690757

Total amount

2.5 millones de pesos mexicanos (2,456,689.69 MXN)

Contract period(s)

Between 3 de enero de 2018 and 2 de abril de 2018

Description

K-659.- CONSTRUCCION DE FUENTE DE ABASTECIMIENTO DEL SISTEMA DE AGUA POTABLE EN LA RANCHERIA GONZALEZ 1RA. SECCION, INCLUYE: EQUIPAMIENTO Y OBRAS COMPLEMENTARIAS. RANCHERIA GONZALEZ 1RA. SECCION, MUNICIPIO DE CENTRO, TABASCO LOCALIDAD: 0098.- RA. GONZALEZ 1RA. SECCION

This contract is part of a record. See record ocds-0ud2q6-IO-827004998-E156-2017 in Open Contracting Data Standard format.

CONTRACT QUALITY

More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.

This contract has not been evaluated.

PLANNING

Project: F ENT FED MUN PROD HIDROCARBUR (23U093)

CALL FOR TENDERS

Call type

Invitación a Cuando Menos 3 Personas (limited)

Regulations: 04. Invitación a Cuando Menos Tres Personas LOPSRM

Scope

Nacional

Purchase type

Obra Pública (works)

Submission methods:

inPerson

Call period:

28 de diciembre de 2017 - 29 de diciembre de 2017

Call status

complete

AWARD AND CONTRACT

Call title

K-664.- MANTENIMIENTO GENERAL DEL SISTEMA DE ABASTECIMIENTO Y DISTRIBUCION

Award title

CO-K-664-209F/2017

Contract title

CO-K-664-209F/2017

Amount

2.5 millones de pesos mexicanos (2,456,689.69 MXN)

Award decision date

30 de diciembre de 2017

Signature date

30 de diciembre de 2017

Execution period

3 de enero de 2018 to 2 de abril de 2018

Internal award code

1690757

This contract is Expirado (terminated) . The contract term has ended.