Total amount
2.5 millones de pesos mexicanos (2,456,689.69 MXN)
Contract period(s)
Between 3 de enero de 2018 and 2 de abril de 2018Description
K-659.- CONSTRUCCION DE FUENTE DE ABASTECIMIENTO DEL SISTEMA DE AGUA POTABLE EN LA RANCHERIA GONZALEZ 1RA. SECCION, INCLUYE: EQUIPAMIENTO Y OBRAS COMPLEMENTARIAS. RANCHERIA GONZALEZ 1RA. SECCION, MUNICIPIO DE CENTRO, TABASCO LOCALIDAD: 0098.- RA. GONZALEZ 1RA. SECCION
Buying unit
DIRECCION DE OBRAS, ORDENAMIENTO TERRITORIAL Y SERVICIOS MUNICIPALES at level municipal in MéxicoThis contract is part of a record. See record ocds-0ud2q6-IO-827004998-E156-2017 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
DIRECCION DE OBRAS, ORDENAMIENTO TERRITORIAL Y SERVICIOS MUNICIPALES (Code: 827004998 )
Invitación a Cuando Menos 3 Personas (limited)
Regulations: 04. Invitación a Cuando Menos Tres Personas LOPSRM
Submission methods:
inPerson
Call period:
28 de diciembre de 2017 - 29 de diciembre de 2017
Call status
complete
Call title
K-664.- MANTENIMIENTO GENERAL DEL SISTEMA DE ABASTECIMIENTO Y DISTRIBUCION
Award title
CO-K-664-209F/2017
Contract title
CO-K-664-209F/2017
Supplier(s)
Amount
2.5 millones de pesos mexicanos (2,456,689.69 MXN)
Signature date
30 de diciembre de 2017
Execution period
3 de enero de 2018 to 2 de abril de 2018
Internal award code
1690757