CONSTRUCCIÓN DE PUENTE VEHICULAR "XONENE" UBICADO EN EL KILÓMETRO 5+903.15 DEL CAMINO SAN PEDRO POCHUTLA-XONENE, EN EL CRUCE DEL RIO GRANDE 2DA ETAPA

CONTRACT SUMMARY IO-820324955-N1-2014-476412

Total amount

16.3 millones de pesos mexicanos (16,318,123.01 MXN)

Contract period(s)

Between 21 de abril de 2013 and 7 de noviembre de 2013

This contract is part of a record. See record ocds-0ud2q6-IO-820324955-N1-2014 in Open Contracting Data Standard format.

CONTRACT QUALITY

More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.

This contract has not been evaluated.

PLANNING

CALL FOR TENDERS

Buying unit

Regiduría de obras (Code: 820324955 )

Call type

Invitación a Cuando Menos 3 Personas (limited)

Regulations: Z15122015 19. Invitación a cuando menos tres Nacional LOPSRM

Purchase type

Obra Pública (works)

Call status

complete

AWARD AND CONTRACT

Call title

CONSTRUCCIÓN DE PUENTE VEHICULAR "XONENE" 2DA ETAPA

Award title

CONSTRUCCIÓN DE PUENTE VEHICULAR "XONENE" UBICADO EN EL KILÓMETRO 5+903.15 DEL CAMINO SAN PEDRO POCHUTLA-XONENE, EN EL CRUCE DEL RIO GRANDE 2DA ETAPA

Contract title

CONSTRUCCIÓN DE PUENTE VEHICULAR "XONENE" UBICADO EN EL KILÓMETRO 5+903.15 DEL CAMINO SAN PEDRO POCHUTLA-XONENE, EN EL CRUCE DEL RIO GRANDE 2DA ETAPA

Amount

16.3 millones de pesos mexicanos (16,318,123.01 MXN)

Signature date

21 de abril de 2013

Execution period

21 de abril de 2013 to 7 de noviembre de 2013

Internal award code

476412

This contract is Expirado (terminated) . The contract term has ended.
This contract has been archived

IMPLEMENTATION

No data

GENERAL INFORMATION

Date updated in QQW

24 de enero de 2019

Part of the project

TodosLosContratos.mx

Organization responsible for the import

PODER