Total amount
5.3 millones de pesos mexicanos (5,334,629.67 MXN)
Contract period(s)
Between 2 de junio de 2018 and 29 de octubre de 2018Description
SE REALIZARA LA AMPLIACION DEL SISTEMA DE DRENAJE MEDIANTE LA EXCAVACION DE SECCION DE TERRENO PARA LA INSTALACION DE 6,490 ML DE TUBERIA PARED CORRUGADA DE POLIETILENO DE ALTA DENSIDAD DE 20 CMS DE DIAMETRO, CONSTRUCCION DE 158 POZOS DE VISITA DE DIFERENTES ALTURAS, INSTALACION DE 158 TAPAS COMO BROCAL PARA POZO, CONEXIÓN DE 90 DESCARGAS DOMICILIARIAS, RELLENO COMPACTADO DE MATERIAL Y LIMPIEZA GENERAL DE LA OBRA.
This contract is part of a record. See record ocds-0ud2q6-IO-820242941-E1-2018 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Regiduría de Obras (Code: 820242941 )
Invitación a Cuando Menos 3 Personas (limited)
Regulations: 04. Invitación a Cuando Menos Tres Personas LOPSRM
Submission methods:
electronicSubmission
Call period:
12 de junio de 2018 - 22 de junio de 2018
Call status
complete
Call title
AMPLIACION DEL SISTEMA DE DRENAJE SANITARIO SAN MARTÍN PERAS
Award title
AMPLIACIÓN DEL SISTEMA DE DRENAJE SANITARIO
Contract title
AMPLIACIÓN DEL SISTEMA DE DRENAJE SANITARIO
Supplier(s)
CONSTRUCTORA INCOSUR SA DE CV (RFC: CIN0612077G9)
Amount
5.3 millones de pesos mexicanos (5,334,629.67 MXN)
Signature date
27 de junio de 2018
Execution period
2 de junio de 2018 to 29 de octubre de 2018
Internal award code
1846025
No data
Date updated in QQW
11 de septiembre de 2019
Source(s)
Part of the project
Organization responsible for the import