Total amount
4.3 millones de pesos mexicanos (4,310,344.83 MXN)
Contract period(s)
Between 10 de mayo de 2018 and 5 de noviembre de 2018Description
SE CONSTRUIRÁ LA SEGUNDA ETAPA DE LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES EN EL MUNICIPIO DE SAN AGUSTÍN LOXICHA, LA CUAL CONTARA CON EL TRATAMIENTO AL 70%
This contract is part of a record. See record ocds-0ud2q6-IO-820085866-E1-2018 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Regiduría de obras (Code: 820085866 )
Invitación a Cuando Menos 3 Personas (limited)
Regulations: 04. Invitación a Cuando Menos Tres Personas LOPSRM
Submission methods:
electronicSubmission, inPerson
Call period:
19 de abril de 2018 - 4 de mayo de 2018
Call status
complete
Call title
CONSTRUCCION DE LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (2DA ETAPA)
Award title
CONSTRUCCION DE LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (2DA ETAPA), EN LA LOCALIDAD DE SAN AGUSTIN LOXICHA (BARRIO SANTA MARIA) EN EL MUNICIPIO DEL MISMO NOMBRE
Contract title
CONSTRUCCION DE LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (2DA ETAPA), EN LA LOCALIDAD DE SAN AGUSTIN LOXICHA (BARRIO SANTA MARIA) EN EL MUNICIPIO DEL MISMO NOMBRE
Supplier(s)
CONSTRUCTORA INCOSUR SA DE CV (RFC: CIN0612077G9)
Amount
4.3 millones de pesos mexicanos (4,310,344.83 MXN)
Signature date
9 de mayo de 2018
Execution period
10 de mayo de 2018 to 5 de noviembre de 2018
Internal award code
1799945
No data
Date updated in QQW
11 de septiembre de 2019
Source(s)
Part of the project
Organization responsible for the import