Total amount
636,213.6 pesos mexicanos
Contract period(s)
Between 8 de julio de 2015 and 8 de octubre de 2015This contract is part of a record. See record ocds-0ud2q6-IO-816108798-N9-2015 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Municipio de Zamora Michoacan (Code: 816108798 )
Invitación a Cuando Menos 3 Personas (limited)
Regulations: Z15122015 19. Invitación a cuando menos tres Nacional LOPSRM
Submission methods:
inPerson
Call status
complete
Call title
CONSTRUCCIÓN DE CALLE DURAZNO, COL. EL VERGEL EN CONCRETO HIDRÁULICO DE 15 CM. T
Award title
CONSTRUCCIÓN DE CALLE DURAZNO, COL. EL VERGEL EN CONCRETO HIDRÁULICO DE 15 CM. T
Contract title
CONSTRUCCIÓN DE CALLE DURAZNO, COL. EL VERGEL EN CONCRETO HIDRÁULICO DE 15 CM. T
Supplier(s)
Amount
636,213.6 pesos mexicanos
Signature date
7 de julio de 2015
Execution period
8 de julio de 2015 to 8 de octubre de 2015
Internal award code
1261252
No data
Date updated in QQW
24 de enero de 2019
Source(s)
Part of the project
Organization responsible for the import