Total amount
370,407.3 pesos mexicanos
Contract period(s)
Between 23 de noviembre de 2016 and 24 de marzo de 2017This contract is part of a record. See record ocds-0ud2q6-IO-805002985-N10-2015 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
DIRECCION DE OBRAS PUBLICAS MUNICIPALES (Code: 805002985 )
Invitación a Cuando Menos 3 Personas (limited)
Regulations: Z15122015 19. Invitación a cuando menos tres Nacional LOPSRM
Submission methods:
inPerson
Call period:
9 de noviembre de 2015 - 16 de noviembre de 2015
Call status
complete
Call title
PAVIMENTACION DE CONCRETO HIDRAULICO DE CALLE GENERAL CEPEDA ENTRE SALTILLO Y P.
Award title
PAVIMENTACION CON CONCRETO HIDRAULICO DE CALLE GENERAL CEPEDA ENTRE SALTILLO Y PIEDRAS NEGRAS DE LA COL. FCO. I. MADERO DE LA LOCALIDAD DEL MUNICIPIO DE ACUÑA, COAHUILA
Contract title
PAVIMENTACION CON CONCRETO HIDRAULICO DE CALLE GENERAL CEPEDA ENTRE SALTILLO Y PIEDRAS NEGRAS DE LA COL. FCO. I. MADERO DE LA LOCALIDAD DEL MUNICIPIO DE ACUÑA, COAHUILA
Supplier(s)
Amount
370,407.3 pesos mexicanos
Execution period
23 de noviembre de 2016 to 24 de marzo de 2017
Internal award code
1368117
No data
Date updated in QQW
24 de enero de 2019
Source(s)
Part of the project
Organization responsible for the import