Total amount
74 millones de pesos mexicanos (74,004,956 MXN)
Contract period(s)
Between 23 de noviembre de 2015 and 30 de marzo de 2017This contract is part of a record. See record ocds-0ud2q6-IO-805002983-N26-2015 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
DESARROLLO SOCIAL (Code: 805002983 )
Invitación a Cuando Menos 3 Personas (limited)
Regulations: Z15122015 19. Invitación a cuando menos tres Nacional LOPSRM
Submission methods:
inPerson
Call period:
9 de noviembre de 2015 - 16 de noviembre de 2015
Call status
complete
Call title
PAVIMENTACION ASFALTICA DE LA CALLE SALTILLO ENTRE ARTEAGA E ITURBIDE (PROGRAMA
Award title
PAVIMENTACION ASFALTICA DE LA CALLE SALTILLO ENTRE ARTEAGA E ITURBIDE (PROGRAMA DE MEJORAS DE VIALIDADES) EN COL. FCO. I. MADERO DE LA LOCALIDAD DEL MUNICIPIO DE ACUNA, COAHUILA.
Contract title
PAVIMENTACION ASFALTICA DE LA CALLE SALTILLO ENTRE ARTEAGA E ITURBIDE (PROGRAMA DE MEJORAS DE VIALIDADES) EN COL. FCO. I. MADERO DE LA LOCALIDAD DEL MUNICIPIO DE ACUNA, COAHUILA.
Supplier(s)
Amount
74 millones de pesos mexicanos (74,004,956 MXN)
Execution period
23 de noviembre de 2015 to 30 de marzo de 2017
Internal award code
1375350
No data
Date updated in QQW
24 de enero de 2019