Total amount
1.7 millones de pesos mexicanos (1,719,356.67 MXN)
Contract period(s)
Between 29 de marzo de 2018 and 26 de julio de 2018Description
“CONSTRUCCIÓN DEL SISTEMA DE ALCANTARILLADO SANITARIO INCLUYE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD CUATZAPOTITLA MUNICIPIO DE CHICONTEPEC”
This contract is part of a record. See record ocds-0ud2q6-IO-047AYB010-E8-2018 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Oficina de Representación en Veracruz (Code: 047AYB010 )
Invitación a Cuando Menos 3 Personas (limited)
Regulations: 04. Invitación a Cuando Menos Tres Personas LOPSRM
Submission methods:
inPerson
Call period:
13 de marzo de 2018 - 23 de marzo de 2018
Call status
complete
Call title
CONSTRUCCION DEL DRENAJE SANITARIO EN EL MUNICIPIO DE CHICONTEPEC
Award title
CONSTRUCCION DEL DRENAJE SANITARIO EN EL MUNICIPIO DE CHICONTEPEC
Contract title
CONSTRUCCION DEL DRENAJE SANITARIO EN EL MUNICIPIO DE CHICONTEPEC
Supplier(s)
GOMVER GRUPO CONSTRUCTOR SA DE CV (RFC: GGC0204052V1)
Amount
1.7 millones de pesos mexicanos (1,719,356.67 MXN)
Signature date
28 de marzo de 2018
Execution period
29 de marzo de 2018 to 26 de julio de 2018
Internal award code
1760121
No data
Date updated in QQW
11 de septiembre de 2019
Source(s)
Part of the project
Organization responsible for the import