CONSTRUCCIÓN DE 4 200.00 M DE PISO FIRME DE CONCRETO HIDRÁULICO HECHO EN OBRA A REALIZARSE EN 150 VIVIENDAS DE 1 LOCALIDAD DEL MUNICIPIO DE MATAMOROS EN EL ESTADO DE TAMAULIPAS

CONTRACT SUMMARY IO-020000877-010-2015-IO-020000877-010-2015

Total amount

996,489.8 pesos mexicanos

Contract period(s)

Between 8 de junio de 2015 and 6 de agosto de 2015

Proveedor(es)

SAJMEN S.A. DE C.V.

This contract is part of a record. See record ocds-0ud2q6-IO-020000877-010-2015 in Open Contracting Data Standard format.

CONTRACT QUALITY

More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.

This contract has not been evaluated.

PLANNING

No data

CALL FOR TENDERS

Call type

INVITACION A TRES PERSONAS (limited)

Call status

complete

AWARD AND CONTRACT

Call title

CONSTRUCCIÓN DE 4 200.00 M DE PISO FIRME DE CONCRETO HIDRÁULICO HECHO EN OBRA A REALIZARSE EN 150 VIVIENDAS DE 1 LOCALIDAD DEL MUNICIPIO DE MATAMOROS EN EL ESTADO DE TAMAULIPAS

Award title

CONSTRUCCIÓN DE 4 200.00 M DE PISO FIRME DE CONCRETO HIDRÁULICO HECHO EN OBRA A REALIZARSE EN 150 VIVIENDAS DE 1 LOCALIDAD DEL MUNICIPIO DE MATAMOROS EN EL ESTADO DE TAMAULIPAS

Contract title

CONSTRUCCIÓN DE 4 200.00 M DE PISO FIRME DE CONCRETO HIDRÁULICO HECHO EN OBRA A REALIZARSE EN 150 VIVIENDAS DE 1 LOCALIDAD DEL MUNICIPIO DE MATAMOROS EN EL ESTADO DE TAMAULIPAS

Supplier(s)

SAJMEN S.A. DE C.V.

Amount

996,489.8 pesos mexicanos

Signature date

13 de abril de 2008

Execution period

8 de junio de 2015 to 6 de agosto de 2015

Internal award code

IO-020000877-010-2015

This contract is (terminated)

IMPLEMENTATION

No data

GENERAL INFORMATION

Date updated in QQW

9 de mayo de 2021

Part of the project

TodosLosContratos.mx

Organization responsible for the import

PODER