Total amount
7.5 millones de pesos mexicanos (7,455,033.46 MXN)
Contract period(s)
Between 5 de noviembre de 2014 and 19 de marzo de 2015This contract is part of a record. See record ocds-0ud2q6-IO-018TOQ988-N802-2014 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
DIVISION DE DISTRIBUCION VALLE DE MEXICO CENTRO (Code: 018TOQ988 )
Invitación a Cuando Menos 3 Personas (limited)
Regulations: Z15122015 19. Invitación a cuando menos tres Nacional LOPSRM
Submission methods:
electronicSubmission
Call period:
5 de septiembre de 2014 - 17 de septiembre de 2014
Call status
complete
Call title
IO-018TOQ988-N802-2014 MODERNIZ DE LA RED ELECT SUBT DE LA AV PASEO DE LA REFOR
Award title
MODERNIZACION DE LA RED ELECTRICA SUBTERRANEA DE LA AVENIDA PASEO DE LA REFORMA DE LA CD. DE MEXICO, OBRA CIVIL PAQUETE VIII
Contract title
MODERNIZACION DE LA RED ELECTRICA SUBTERRANEA DE LA AVENIDA PASEO DE LA REFORMA DE LA CD. DE MEXICO, OBRA CIVIL PAQUETE VIII
Supplier(s)
Amount
7.5 millones de pesos mexicanos (7,455,033.46 MXN)
Signature date
25 de septiembre de 2014
Execution period
5 de noviembre de 2014 to 19 de marzo de 2015
Internal award code
634877
No data
Date updated in QQW
24 de enero de 2019
Source(s)
Part of the project
Organization responsible for the import