Total amount
1.8 millones de pesos mexicanos (1,762,858.44 MXN)
Contract period(s)
Between 28 de abril de 2017 and 26 de julio de 2017This contract is part of a record. See record ocds-0ud2q6-IO-016B00016-E64-2017 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
ORGANISMO DE CUENCA GOLFO CENTRO CONTROL TECNICO (Code: 016B00016 )
Invitación a Cuando Menos 3 Personas (limited)
Regulations: 04. Invitación a Cuando Menos Tres Personas LOPSRM
Submission methods:
electronicSubmission, inPerson
Call period:
8 de mayo de 2017 - 9 de mayo de 2017
Call status
complete
Call title
ESTUDIO Y PROYECTO EJECUTIVO PARA LA RECONSTRUCCIÓN DE LA MÁRGEN DERECHA DEL RÍO
Award title
SGIH-OCGC-VER-17-086-FN-I3
Contract title
SGIH-OCGC-VER-17-086-FN-I3
Supplier(s)
Amount
1.8 millones de pesos mexicanos (1,762,858.44 MXN)
Signature date
27 de abril de 2017
Execution period
28 de abril de 2017 to 26 de julio de 2017
Internal award code
1484996