Total amount
13.4 millones de pesos mexicanos (13,371,942.68 MXN)
Contract period(s)
Between 10 de mayo de 2010 and 30 de noviembre de 2010This contract is part of a record. See record ocds-0ud2q6-GARMOP-OP-K-06-2010 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Call status
complete
Call title
CONSTRUCCION DE LOS PUENTES HIDALGO Y FLORIDO EN EL LIBRAMIENTO DE TAPACHULA LÍNEA FÉRREA K CHIAPAS.
Award title
CONSTRUCCION DE LOS PUENTES HIDALGO Y FLORIDO EN EL LIBRAMIENTO DE TAPACHULA LÍNEA FÉRREA K CHIAPAS.
Contract title
CONSTRUCCION DE LOS PUENTES HIDALGO Y FLORIDO EN EL LIBRAMIENTO DE TAPACHULA LÍNEA FÉRREA K CHIAPAS.
Supplier(s)
Amount
13.4 millones de pesos mexicanos (13,371,942.68 MXN)
Signature date
30 de abril de 2010
Execution period
10 de mayo de 2010 to 30 de noviembre de 2010
Internal award code
GARMOP-OP-K-06-2010
No data
Date updated in QQW
9 de mayo de 2021
Part of the project
Organization responsible for the import