Total amount
6.6 millones de pesos mexicanos (6,596,350.63 MXN)
Contract period(s)
Between 1 de octubre de 2016 and 30 de junio de 2017This contract is part of a record. See record ocds-0ud2q6-DGDIF-020-16 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Call status
complete
Call title
RECONSTRUCCION DE LOS CENTRO DE SALUD COLIMA SUCHITLAN ARMERIA ESTACION INSTITUTO ESTATAL DE CANCEROLOGIA Y HOSPITAL GENERAL DE MANZANILLO TODOS UBICADOS EN EL ESTADO DE COLIMA MEXICO.
Award title
RECONSTRUCCION DE LOS CENTRO DE SALUD COLIMA SUCHITLAN ARMERIA ESTACION INSTITUTO ESTATAL DE CANCEROLOGIA Y HOSPITAL GENERAL DE MANZANILLO TODOS UBICADOS EN EL ESTADO DE COLIMA MEXICO.
Contract title
RECONSTRUCCION DE LOS CENTRO DE SALUD COLIMA SUCHITLAN ARMERIA ESTACION INSTITUTO ESTATAL DE CANCEROLOGIA Y HOSPITAL GENERAL DE MANZANILLO TODOS UBICADOS EN EL ESTADO DE COLIMA MEXICO.
Supplier(s)
Amount
6.6 millones de pesos mexicanos (6,596,350.63 MXN)
Signature date
27 de septiembre de 2016
Execution period
1 de octubre de 2016 to 30 de junio de 2017
Internal award code
DGDIF-020-16
No data
Date updated in QQW
9 de mayo de 2021
Part of the project
Organization responsible for the import