Total amount
3.4 millones de pesos mexicanos (3,389,793.28 MXN)
Contract period(s)
Between 28 de abril de 2014 and 5 de diciembre de 2014This contract is part of a record. See record ocds-0ud2q6-DGDIF-014-14 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Call status
complete
Call title
PRO Y CORRESPONSABLES PARA LA CONSTRUCCION DE LA TERCERA ETAPA DEL HOSPITAL PSIQUIATRICO SAMUEL RAMIREZ MORENO UBICADO EN LA AUTOPISTA MEXICO-PUEBLA No. 83 COL. AMPLIACION SANTA CATARINA MUNICIPIO VALLE DE CHALCO SOLIDARIDAD C.P. 56619 EDO. DE MEXICO.
Award title
PRO Y CORRESPONSABLES PARA LA CONSTRUCCION DE LA TERCERA ETAPA DEL HOSPITAL PSIQUIATRICO SAMUEL RAMIREZ MORENO UBICADO EN LA AUTOPISTA MEXICO-PUEBLA No. 83 COL. AMPLIACION SANTA CATARINA MUNICIPIO VALLE DE CHALCO SOLIDARIDAD C.P. 56619 EDO. DE MEXICO.
Contract title
PRO Y CORRESPONSABLES PARA LA CONSTRUCCION DE LA TERCERA ETAPA DEL HOSPITAL PSIQUIATRICO SAMUEL RAMIREZ MORENO UBICADO EN LA AUTOPISTA MEXICO-PUEBLA No. 83 COL. AMPLIACION SANTA CATARINA MUNICIPIO VALLE DE CHALCO SOLIDARIDAD C.P. 56619 EDO. DE MEXICO.
Supplier(s)
Amount
3.4 millones de pesos mexicanos (3,389,793.28 MXN)
Signature date
15 de abril de 2014
Execution period
28 de abril de 2014 to 5 de diciembre de 2014
Internal award code
DGDIF-014-14
No data
Date updated in QQW
9 de mayo de 2021
Part of the project
Organization responsible for the import