Let me know when the data is updated again

CONSTRUCCIÓN DE 47 163.00 M2 DE PISO FIRME DE CONCRETO HIDRÁULICO A REALIZARSE EN 1 657 VIVIENDAS DE 13 LOCALIDADES DEL MUNICIPIO DE TECOMÁN EN EL ESTADO DE COLIMA

CONTRACT SUMMARY COL/003-2009-COL/003-2009

Total amount

6.6 millones de pesos mexicanos (6,628,280.88 MXN)

Contract period(s)

Between 29 de octubre de 2009 and 31 de diciembre de 2009

Proveedor(es)

MARIO GARIVO BRAVO

This contract is part of a record. See record ocds-0ud2q6-COL/003-2009 in Open Contracting Data Standard format.

CONTRACT QUALITY

More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.

This contract has not been evaluated.

PLANNING

No data

CALL FOR TENDERS

Call type

LICITACION PUBLICA NACIONAL (open)

Call status

complete

AWARD AND CONTRACT

Call title

CONSTRUCCIÓN DE 47 163.00 M2 DE PISO FIRME DE CONCRETO HIDRÁULICO A REALIZARSE EN 1 657 VIVIENDAS DE 13 LOCALIDADES DEL MUNICIPIO DE TECOMÁN EN EL ESTADO DE COLIMA

Award title

CONSTRUCCIÓN DE 47 163.00 M2 DE PISO FIRME DE CONCRETO HIDRÁULICO A REALIZARSE EN 1 657 VIVIENDAS DE 13 LOCALIDADES DEL MUNICIPIO DE TECOMÁN EN EL ESTADO DE COLIMA

Contract title

CONSTRUCCIÓN DE 47 163.00 M2 DE PISO FIRME DE CONCRETO HIDRÁULICO A REALIZARSE EN 1 657 VIVIENDAS DE 13 LOCALIDADES DEL MUNICIPIO DE TECOMÁN EN EL ESTADO DE COLIMA

Supplier(s)

MARIO GARIVO BRAVO

Amount

6.6 millones de pesos mexicanos (6,628,280.88 MXN)

Signature date

29 de octubre de 2009

Execution period

29 de octubre de 2009 to 31 de diciembre de 2009

Internal award code

COL/003-2009

This contract is (terminated)

IMPLEMENTATION

No data

GENERAL INFORMATION

Date updated in QQW

9 de mayo de 2021

Part of the project

TodosLosContratos.mx

Organization responsible for the import

PODER