Total amount
1.8 millones de pesos mexicanos (1,786,029.19 MXN)
Contract period(s)
Between 23 de mayo de 2013 and 11 de junio de 2013This contract is part of a record. See record ocds-0ud2q6-APIALT-CI-007/13 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Call status
complete
Call title
MANTENIMIENTO A INSTALACIONES DEL CENTRO CONTROL DE TRÁFICO MARÍTIMO AÑO 2013 EN EL PUERTO INDUSTRIAL DE ALTAMIRA TAM
Award title
MANTENIMIENTO A INSTALACIONES DEL CENTRO CONTROL DE TRÁFICO MARÍTIMO AÑO 2013 EN EL PUERTO INDUSTRIAL DE ALTAMIRA TAM
Contract title
MANTENIMIENTO A INSTALACIONES DEL CENTRO CONTROL DE TRÁFICO MARÍTIMO AÑO 2013 EN EL PUERTO INDUSTRIAL DE ALTAMIRA TAM
Supplier(s)
Amount
1.8 millones de pesos mexicanos (1,786,029.19 MXN)
Signature date
20 de mayo de 2013
Execution period
23 de mayo de 2013 to 11 de junio de 2013
Internal award code
APIALT-CI-007/13
No data
Date updated in QQW
9 de mayo de 2021
Part of the project
Organization responsible for the import