Total amount
1.7 millones de pesos mexicanos (1,749,681.69 MXN)
Contract period(s)
Between 10 de marzo de 2008 and 22 de junio de 2008This contract is part of a record. See record ocds-0ud2q6-API-MAN-CON-01-08 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Call title
ESTUDIO DE PREFACTIBILIDAD Y PROYECTO EJECUTIVO DE LA CONECTIVIDAD FERROVIARIA ENTRE EL PUERTO INTERIOR DE SAN PEDRITO Y RAMAL RIVERA NORTE LAGUNA DE CUYUTLAN EN MANZANILLO COLIMA
Award title
ESTUDIO DE PREFACTIBILIDAD Y PROYECTO EJECUTIVO DE LA CONECTIVIDAD FERROVIARIA ENTRE EL PUERTO INTERIOR DE SAN PEDRITO Y RAMAL RIVERA NORTE LAGUNA DE CUYUTLAN EN MANZANILLO COLIMA
Contract title
ESTUDIO DE PREFACTIBILIDAD Y PROYECTO EJECUTIVO DE LA CONECTIVIDAD FERROVIARIA ENTRE EL PUERTO INTERIOR DE SAN PEDRITO Y RAMAL RIVERA NORTE LAGUNA DE CUYUTLAN EN MANZANILLO COLIMA
Supplier(s)
Amount
1.7 millones de pesos mexicanos (1,749,681.69 MXN)
Signature date
4 de marzo de 2008
Execution period
10 de marzo de 2008 to 22 de junio de 2008
Internal award code
API-MAN-CON-01-08
No data
Date updated in QQW
9 de mayo de 2021
Part of the project
Organization responsible for the import