Let me know when the data is updated again

ESTUDIO DE PREFACTIBILIDAD Y PROYECTO EJECUTIVO DE LA CONECTIVIDAD FERROVIARIA ENTRE EL PUERTO INTERIOR DE SAN PEDRITO Y RAMAL RIVERA NORTE LAGUNA DE CUYUTLAN EN MANZANILLO COLIMA

CONTRACT SUMMARY API-MAN-CON-01-08-API-MAN-CON-01-08

Total amount

1.7 millones de pesos mexicanos (1,749,681.69 MXN)

Contract period(s)

Between 10 de marzo de 2008 and 22 de junio de 2008

This contract is part of a record. See record ocds-0ud2q6-API-MAN-CON-01-08 in Open Contracting Data Standard format.

CONTRACT QUALITY

More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.

This contract has not been evaluated.

PLANNING

No data

CALL FOR TENDERS

Call type

INVITACION A TRES PERSONAS (limited)

Call status

complete

AWARD AND CONTRACT

Call title

ESTUDIO DE PREFACTIBILIDAD Y PROYECTO EJECUTIVO DE LA CONECTIVIDAD FERROVIARIA ENTRE EL PUERTO INTERIOR DE SAN PEDRITO Y RAMAL RIVERA NORTE LAGUNA DE CUYUTLAN EN MANZANILLO COLIMA

Award title

ESTUDIO DE PREFACTIBILIDAD Y PROYECTO EJECUTIVO DE LA CONECTIVIDAD FERROVIARIA ENTRE EL PUERTO INTERIOR DE SAN PEDRITO Y RAMAL RIVERA NORTE LAGUNA DE CUYUTLAN EN MANZANILLO COLIMA

Contract title

ESTUDIO DE PREFACTIBILIDAD Y PROYECTO EJECUTIVO DE LA CONECTIVIDAD FERROVIARIA ENTRE EL PUERTO INTERIOR DE SAN PEDRITO Y RAMAL RIVERA NORTE LAGUNA DE CUYUTLAN EN MANZANILLO COLIMA

Amount

1.7 millones de pesos mexicanos (1,749,681.69 MXN)

Signature date

4 de marzo de 2008

Execution period

10 de marzo de 2008 to 22 de junio de 2008

Internal award code

API-MAN-CON-01-08

This contract is (terminated)

IMPLEMENTATION

No data

GENERAL INFORMATION

Date updated in QQW

9 de mayo de 2021

Part of the project

TodosLosContratos.mx

Organization responsible for the import

PODER