Let me know when the data is updated again

OBRA CIVIL PARA REEMPLAZO DE EQUIPOS DE SECCIONAMIENTO TIPO (X) Y RECALIBRACION DE CABLE BTC 1X150 A 350 KCM AL XLP 3C/1N PARA BAJA TENSION SUBTERRANEA COL. SANTA MARIA LA RIBERA, CIRCUITO ROSALES, S.E. NONOALCO, AREA TLATELOLCO, DEL. CUAUHTEMOC

CONTRACT SUMMARY AO-018TOQ988-N600-2011-85310

Total amount

358,120 pesos mexicanos

Contract period(s)

Between 30 de septiembre de 2011 and 28 de noviembre de 2011

This contract is part of a record. See record ocds-0ud2q6-AO-018TOQ988-N600-2011 in Open Contracting Data Standard format.

CONTRACT QUALITY

More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.

This contract has not been evaluated.

PLANNING

CALL FOR TENDERS

Call type

Adjudicación Directa Federal (direct)

Regulations: Z15122015 22. Adjudicación Directa Nacional Art. 43 LOPSRM

Scope

Nacional

Purchase type

Obra Pública (works)

Submission methods:

electronicSubmission, inPerson

Call period:

26 de septiembre de 2011 - 27 de septiembre de 2011

Call status

complete

AWARD AND CONTRACT

Call title

ADJ-DVMC-OP-ZT-040-11.- OBRA CIVIL PARA REEMPLAZO DE EQUIPOS DE SECCIONAMIENTO T

Award title

OBRA CIVIL PARA REEMPLAZO DE EQUIPOS DE SECCIONAMIENTO TIPO (X) Y RECALIBRACION DE CABLE BTC 1X150 A 350 KCM AL XLP 3C/1N PARA BAJA TENSION SUBTERRANEA COL. SANTA MARIA LA RIBERA, CIRCUITO ROSALES, S.E. NONOALCO, AREA TLATELOLCO, DEL. CUAUHTEMOC

Contract title

OBRA CIVIL PARA REEMPLAZO DE EQUIPOS DE SECCIONAMIENTO TIPO (X) Y RECALIBRACION DE CABLE BTC 1X150 A 350 KCM AL XLP 3C/1N PARA BAJA TENSION SUBTERRANEA COL. SANTA MARIA LA RIBERA, CIRCUITO ROSALES, S.E. NONOALCO, AREA TLATELOLCO, DEL. CUAUHTEMOC

Amount

358,120 pesos mexicanos

Execution period

30 de septiembre de 2011 to 28 de noviembre de 2011

Internal award code

85310

This contract is Expirado (terminated) . The contract term has ended.
This contract has been archived

IMPLEMENTATION

No data

GENERAL INFORMATION

Date updated in QQW

8 de noviembre de 2019

Part of the project

TodosLosContratos.mx

Organization responsible for the import

PODER