Total amount
380,090.4 pesos mexicanos
Contract period(s)
Between 11 de noviembre de 2014 and 9 de enero de 2015This contract is part of a record. See record ocds-0ud2q6-AO-018TOQ033-N79-2014 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Departamento de Concursos y Contratos en Michoacán (Code: 018TOQ033 )
Adjudicación Directa Federal (direct)
Regulations: Z15122015 22. Adjudicación Directa Nacional Art. 43 LOPSRM
Submission methods:
electronicSubmission
Call period:
13 de octubre de 2014 - 16 de octubre de 2014
Call status
complete
Call title
DCO- CONSTRUCCIÓN DE OBRA CIVIL PARA ADICION DE BANCO EN S.E. MIRADOR
Award title
CONSTRUCCION DE OBRA CIVIL PARA ADICION DE BANCO DE TRANSFORMADOR EN S.E. MIRADOR
Contract title
CONSTRUCCION DE OBRA CIVIL PARA ADICION DE BANCO DE TRANSFORMADOR EN S.E. MIRADOR
Supplier(s)
Amount
380,090.4 pesos mexicanos
Signature date
31 de octubre de 2014
Execution period
11 de noviembre de 2014 to 9 de enero de 2015
Internal award code
667692
No data
Date updated in QQW
24 de enero de 2019
Source(s)