ESTUDIO Y PROYECTO DE OBRA DE DRENAJE Y MODIFICACIÓN DE RASANTE KM 2 600 AL KM RAMAL AL NUEVO AEROPUERTO DE TEPIC TRAMO LIM. EDOS. JAL/NAY-TEPIC DE LA CARRETERA GUADALAJARA-TEPIC EN EL ESTADO DE NAYARIT.

CONTRACT SUMMARY 9-R-CB-A-517-Y-0-9-9-R-CB-A-517-Y-0-9

Total amount

69,695 pesos mexicanos

Contract period(s)

Between 27 de abril de 2009 and 10 de junio de 2009

This contract is part of a record. See record ocds-0ud2q6-9-R-CB-A-517-Y-0-9 in Open Contracting Data Standard format.

CONTRACT QUALITY

More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.

This contract has not been evaluated.

PLANNING

No data

CALL FOR TENDERS

Call type

LICITACION PUBLICA NACIONAL (open)

Call status

complete

AWARD AND CONTRACT

Call title

ESTUDIO Y PROYECTO DE OBRA DE DRENAJE Y MODIFICACIÓN DE RASANTE KM 2 600 AL KM RAMAL AL NUEVO AEROPUERTO DE TEPIC TRAMO LIM. EDOS. JAL/NAY-TEPIC DE LA CARRETERA GUADALAJARA-TEPIC EN EL ESTADO DE NAYARIT.

Award title

ESTUDIO Y PROYECTO DE OBRA DE DRENAJE Y MODIFICACIÓN DE RASANTE KM 2 600 AL KM RAMAL AL NUEVO AEROPUERTO DE TEPIC TRAMO LIM. EDOS. JAL/NAY-TEPIC DE LA CARRETERA GUADALAJARA-TEPIC EN EL ESTADO DE NAYARIT.

Contract title

ESTUDIO Y PROYECTO DE OBRA DE DRENAJE Y MODIFICACIÓN DE RASANTE KM 2 600 AL KM RAMAL AL NUEVO AEROPUERTO DE TEPIC TRAMO LIM. EDOS. JAL/NAY-TEPIC DE LA CARRETERA GUADALAJARA-TEPIC EN EL ESTADO DE NAYARIT.

Amount

69,695 pesos mexicanos

Signature date

23 de abril de 2009

Execution period

27 de abril de 2009 to 10 de junio de 2009

Internal award code

9-R-CB-A-517-Y-0-9

This contract is (terminated)

IMPLEMENTATION

No data

GENERAL INFORMATION

Date updated in QQW

9 de mayo de 2021

Part of the project

TodosLosContratos.mx

Organization responsible for the import

PODER