Total amount
11.3 millones de pesos mexicanos (11,280,798.65 MXN)
Contract period(s)
Between 7 de febrero de 2008 and 31 de diciembre de 2010This contract is part of a record. See record ocds-0ud2q6-8KCBA508W08 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Call status
complete
Call title
CONSERVACIÓN RUTINARIA DEL KM 77 320 AL 84 000 TR. PÉNJAMO-LA PIEDAD DEL KM 0 000 AL 6 900 TR. RAMAL A CORRALEJO KM 0 000 AL 0 900 TR. ACCESO SUR PUENTE DE CUOTA CARR. IRAPUATO-GUADALAJARA KM 0 000 AL 25 600 TR. T IRAPUATO/ABASOLO-CUERÁMARO KM 29 630 AL 66 700 TR. CUERÁMARO-LÍM. GTO./JAL. CARR. IRAPUATO-TEPATITLÁN KM 0 000 AL 8 600 TR. RAMAL A MANUEL DOBLADO CARR. LEÓN-LA PIEDAD
Award title
CONSERVACIÓN RUTINARIA DEL KM 77 320 AL 84 000 TR. PÉNJAMO-LA PIEDAD DEL KM 0 000 AL 6 900 TR. RAMAL A CORRALEJO KM 0 000 AL 0 900 TR. ACCESO SUR PUENTE DE CUOTA CARR. IRAPUATO-GUADALAJARA KM 0 000 AL 25 600 TR. T IRAPUATO/ABASOLO-CUERÁMARO KM 29 630 AL 66 700 TR. CUERÁMARO-LÍM. GTO./JAL. CARR. IRAPUATO-TEPATITLÁN KM 0 000 AL 8 600 TR. RAMAL A MANUEL DOBLADO CARR. LEÓN-LA PIEDAD
Contract title
CONSERVACIÓN RUTINARIA DEL KM 77 320 AL 84 000 TR. PÉNJAMO-LA PIEDAD DEL KM 0 000 AL 6 900 TR. RAMAL A CORRALEJO KM 0 000 AL 0 900 TR. ACCESO SUR PUENTE DE CUOTA CARR. IRAPUATO-GUADALAJARA KM 0 000 AL 25 600 TR. T IRAPUATO/ABASOLO-CUERÁMARO KM 29 630 AL 66 700 TR. CUERÁMARO-LÍM. GTO./JAL. CARR. IRAPUATO-TEPATITLÁN KM 0 000 AL 8 600 TR. RAMAL A MANUEL DOBLADO CARR. LEÓN-LA PIEDAD
Supplier(s)
Amount
11.3 millones de pesos mexicanos (11,280,798.65 MXN)
Signature date
31 de enero de 2008
Execution period
7 de febrero de 2008 to 31 de diciembre de 2010
Internal award code
8KCBA508W08
No data
Date updated in QQW
9 de mayo de 2021
Part of the project