TRABAJOS DE CONSERVACION RUTINARIA LONGITUD DE 85.0 KMS DE RED BASICA EN EL TRAMO: ENT. MORELOS-LIM. ZAC./COAH. DEL KM 0 000 AL 85 000 DE LA CARRETERA ZACATECAS-SALTILLO EN EL ESTADO DE ZACATECAS.

CONTRACT SUMMARY 86CBA612W08-86CBA612W08

Total amount

6.7 millones de pesos mexicanos (6,661,581.68 MXN)

Contract period(s)

Between 1 de febrero de 2008 and 31 de diciembre de 2010

This contract is part of a record. See record ocds-0ud2q6-86CBA612W08 in Open Contracting Data Standard format.

CONTRACT QUALITY

More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.

This contract has not been evaluated.

PLANNING

No data

CALL FOR TENDERS

Call type

LICITACION PUBLICA NACIONAL (open)

Call status

complete

AWARD AND CONTRACT

Call title

TRABAJOS DE CONSERVACION RUTINARIA LONGITUD DE 85.0 KMS DE RED BASICA EN EL TRAMO: ENT. MORELOS-LIM. ZAC./COAH. DEL KM 0 000 AL 85 000 DE LA CARRETERA ZACATECAS-SALTILLO EN EL ESTADO DE ZACATECAS.

Award title

TRABAJOS DE CONSERVACION RUTINARIA LONGITUD DE 85.0 KMS DE RED BASICA EN EL TRAMO: ENT. MORELOS-LIM. ZAC./COAH. DEL KM 0 000 AL 85 000 DE LA CARRETERA ZACATECAS-SALTILLO EN EL ESTADO DE ZACATECAS.

Contract title

TRABAJOS DE CONSERVACION RUTINARIA LONGITUD DE 85.0 KMS DE RED BASICA EN EL TRAMO: ENT. MORELOS-LIM. ZAC./COAH. DEL KM 0 000 AL 85 000 DE LA CARRETERA ZACATECAS-SALTILLO EN EL ESTADO DE ZACATECAS.

Amount

6.7 millones de pesos mexicanos (6,661,581.68 MXN)

Signature date

29 de enero de 2008

Execution period

1 de febrero de 2008 to 31 de diciembre de 2010

Internal award code

86CBA612W08

This contract is (terminated)

IMPLEMENTATION

No data

GENERAL INFORMATION

Date updated in QQW

9 de mayo de 2021

Part of the project

TodosLosContratos.mx