Total amount
93.8 millones de pesos mexicanos (93,770,951.94 MXN)
Contract period(s)
Between 4 de mayo de 2007 and 26 de diciembre de 2007This contract is part of a record. See record ocds-0ud2q6-7MCEA500W07 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Call status
complete
Call title
MODERNIZACION A CUATRO CARRILES MEDIANTE LA CONSTRUCCION DE TERRACERIAS OBRAS DE DRENAJE PAVIMENTACION OBRAS COMPLEMENTARIAS OBRA INDUCIDA Y SEÑALAMIENTO DEL KM.29 000 AL KM. 36 000 ASI COMO LA MODERNIZACION DEL ENTRONQUE VENUSTIANO CARRANZA UBICADO EN EL KM. 29 000 ASI COMO LA AMPLIACION DE UN P.S.V. UBICADO EN EL KM. 30 640 DE LA CARRETERA: PACHUCA CD. SAHAGUN
Award title
MODERNIZACION A CUATRO CARRILES MEDIANTE LA CONSTRUCCION DE TERRACERIAS OBRAS DE DRENAJE PAVIMENTACION OBRAS COMPLEMENTARIAS OBRA INDUCIDA Y SEÑALAMIENTO DEL KM.29 000 AL KM. 36 000 ASI COMO LA MODERNIZACION DEL ENTRONQUE VENUSTIANO CARRANZA UBICADO EN EL KM. 29 000 ASI COMO LA AMPLIACION DE UN P.S.V. UBICADO EN EL KM. 30 640 DE LA CARRETERA: PACHUCA CD. SAHAGUN
Contract title
MODERNIZACION A CUATRO CARRILES MEDIANTE LA CONSTRUCCION DE TERRACERIAS OBRAS DE DRENAJE PAVIMENTACION OBRAS COMPLEMENTARIAS OBRA INDUCIDA Y SEÑALAMIENTO DEL KM.29 000 AL KM. 36 000 ASI COMO LA MODERNIZACION DEL ENTRONQUE VENUSTIANO CARRANZA UBICADO EN EL KM. 29 000 ASI COMO LA AMPLIACION DE UN P.S.V. UBICADO EN EL KM. 30 640 DE LA CARRETERA: PACHUCA CD. SAHAGUN
Supplier(s)
Amount
93.8 millones de pesos mexicanos (93,770,951.94 MXN)
Signature date
23 de abril de 2007
Execution period
4 de mayo de 2007 to 26 de diciembre de 2007
Internal award code
7MCEA500W07
No data
Date updated in QQW
9 de mayo de 2021
Part of the project
Organization responsible for the import