Total amount
53.4 millones de pesos mexicanos (53,439,877.07 MXN)
Contract period(s)
Between 25 de abril de 2007 and 10 de diciembre de 2007This contract is part of a record. See record ocds-0ud2q6-74CEA620W07 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Call status
complete
Call title
CONSTRUCCION DE DOS ESTRUCTURAS Y SUS ACCESOS EN LOS KMS. 46 700 Y 52 700 TRABAJOS FALTANTES EN EL PSV SAN ISIDRO KM. 38 287 CONSTRUCCIÓN DE UN PIPR EN EL KM. 32 400 Y TRABAJOS DIVERSOS DEL KM. 26 780 AL KM. 52 840 UBICACIÓN DE LA OBRA: CARRETERA: VERACRUZ POZA RICA TRAMO: CARDEL LAGUNA VERDE SUBTRAMO DEL KM. 26 780 AL KM. 52 840 EN EL ESTADO DE VERACRUZ
Award title
CONSTRUCCION DE DOS ESTRUCTURAS Y SUS ACCESOS EN LOS KMS. 46 700 Y 52 700 TRABAJOS FALTANTES EN EL PSV SAN ISIDRO KM. 38 287 CONSTRUCCIÓN DE UN PIPR EN EL KM. 32 400 Y TRABAJOS DIVERSOS DEL KM. 26 780 AL KM. 52 840 UBICACIÓN DE LA OBRA: CARRETERA: VERACRUZ POZA RICA TRAMO: CARDEL LAGUNA VERDE SUBTRAMO DEL KM. 26 780 AL KM. 52 840 EN EL ESTADO DE VERACRUZ
Contract title
CONSTRUCCION DE DOS ESTRUCTURAS Y SUS ACCESOS EN LOS KMS. 46 700 Y 52 700 TRABAJOS FALTANTES EN EL PSV SAN ISIDRO KM. 38 287 CONSTRUCCIÓN DE UN PIPR EN EL KM. 32 400 Y TRABAJOS DIVERSOS DEL KM. 26 780 AL KM. 52 840 UBICACIÓN DE LA OBRA: CARRETERA: VERACRUZ POZA RICA TRAMO: CARDEL LAGUNA VERDE SUBTRAMO DEL KM. 26 780 AL KM. 52 840 EN EL ESTADO DE VERACRUZ
Supplier(s)
Amount
53.4 millones de pesos mexicanos (53,439,877.07 MXN)
Signature date
23 de abril de 2007
Execution period
25 de abril de 2007 to 10 de diciembre de 2007
Internal award code
74CEA620W07
No data
Date updated in QQW
9 de mayo de 2021
Part of the project