Total amount
27.7 millones de pesos mexicanos (27,660,977.33 MXN)
Contract period(s)
Between 8 de octubre de 2009 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-54001001-005-08 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Coordinación de Concursos y Seguimiento de Contratos (Code: 54001001 )
Call status
complete
Call title
CONSTRUCCION DE HOSPITAL GENERAL 50 CAMAS (PRIMER PISO), SECCION "C", EN LA LOCALIDAD DE ESCUINPA, MUNICIPIO DE ESCUINAPA, ESTADO DE SINALOA.
Award title
CONSTRUCCION DE HOSPITAL GENERAL 50 CAMAS (PRIMER PISO), SECCION "C", EN LA LOCALIDAD DE ESCUINPA, MUNICIPIO DE ESCUINAPA, ESTADO DE SINALOA.
Contract title
CONSTRUCCION DE HOSPITAL GENERAL 50 CAMAS (PRIMER PISO), SECCION "C", EN LA LOCALIDAD DE ESCUINPA, MUNICIPIO DE ESCUINAPA, ESTADO DE SINALOA.
Supplier(s)
Amount
27.7 millones de pesos mexicanos (27,660,977.33 MXN)
Signature date
8 de octubre de 2009
Execution period
8 de octubre de 2009 to Fecha desconocida
Internal award code
SCOPLP-HOSP-090-2008
No data
Date updated in QQW
9 de mayo de 2021
Source(s)
Part of the project
Organization responsible for the import