Total amount
728,335.1 pesos mexicanos
Contract period(s)
Between 7 de marzo de 2008 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-38302003-006-06 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
Call title
La Construcciýn de la Conducciýn en la Ave. Silvestre Terrazas entre Calle 120a. y Entronque a la Presa Chihuahua y cruceros especiales de preparaciýn (suministro e instalaciýn de piezas especiales e instalaciýn de la lýnea de conducciýn de agua potable) en la Ciudad de Chihuahua. Tramo 1 del Km. 0+008 al Km. 0+820
Award title
La Construcciýn de la Conducciýn en la Ave. Silvestre Terrazas entre Calle 120a. y Entronque a la Presa Chihuahua y cruceros especiales de preparaciýn (suministro e instalaciýn de piezas especiales e instalaciýn de la lýnea de conducciýn de agua potable) en la Ciudad de Chihuahua. Tramo 1 del Km. 0+008 al Km. 0+820
Contract title
La Construcciýn de la Conducciýn en la Ave. Silvestre Terrazas entre Calle 120a. y Entronque a la Presa Chihuahua y cruceros especiales de preparaciýn (suministro e instalaciýn de piezas especiales e instalaciýn de la lýnea de conducciýn de agua potable) en la Ciudad de Chihuahua. Tramo 1 del Km. 0+008 al Km. 0+820
Amount
728,335.1 pesos mexicanos
Signature date
7 de marzo de 2008
Execution period
7 de marzo de 2008 to Fecha desconocida
Internal award code
OP-RF-2006-020-P
No data
Date updated in QQW
9 de mayo de 2021
Source(s)
Part of the project
Organization responsible for the import