Total amount
4.9 millones de pesos mexicanos (4,888,608.07 MXN)
Contract period(s)
Between 9 de mayo de 2008 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-38104002-099-07 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
Call title
Construcciýn de lýnea de conducciýn de aguas negras en la vialidad sacramento entre arroyo el mimbre y PTAR Norte (cýrcamo de bombeo, estructura de soporte, placa antiderrapante, rejilla tipo Irving, automatizaciýn para rebombeo de aguas negras, trenes y manifool de descarga, obra elýctrica, cerco de malla, alumbrado y caseta de control)
Award title
Construcciýn de lýnea de conducciýn de aguas negras en la vialidad sacramento entre arroyo el mimbre y PTAR Norte (cýrcamo de bombeo, estructura de soporte, placa antiderrapante, rejilla tipo Irving, automatizaciýn para rebombeo de aguas negras, trenes y manifool de descarga, obra elýctrica, cerco de malla, alumbrado y caseta de control)
Contract title
Construcciýn de lýnea de conducciýn de aguas negras en la vialidad sacramento entre arroyo el mimbre y PTAR Norte (cýrcamo de bombeo, estructura de soporte, placa antiderrapante, rejilla tipo Irving, automatizaciýn para rebombeo de aguas negras, trenes y manifool de descarga, obra elýctrica, cerco de malla, alumbrado y caseta de control)
Amount
4.9 millones de pesos mexicanos (4,888,608.07 MXN)
Signature date
9 de mayo de 2008
Execution period
9 de mayo de 2008 to Fecha desconocida
Internal award code
194-2007-JCAS-PAPAZU
No data
Date updated in QQW
9 de mayo de 2021