Total amount
5.2 millones de pesos mexicanos (5,202,965.97 MXN)
Contract period(s)
Between 9 de mayo de 2008 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-38104002-098-07 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
Call title
Construcciýn de lýnea de conducciýn de aguas negras en la vialidad sacramento entre arroyo el mimbre y PTAR Norte cadenamiento 0+011.95 al 2+920.56 (Bay Pass Colector Sacramento y Mimbre)
Award title
Construcciýn de lýnea de conducciýn de aguas negras en la vialidad sacramento entre arroyo el mimbre y PTAR Norte cadenamiento 0+011.95 al 2+920.56 (Bay Pass Colector Sacramento y Mimbre)
Contract title
Construcciýn de lýnea de conducciýn de aguas negras en la vialidad sacramento entre arroyo el mimbre y PTAR Norte cadenamiento 0+011.95 al 2+920.56 (Bay Pass Colector Sacramento y Mimbre)
Supplier(s)
Amount
5.2 millones de pesos mexicanos (5,202,965.97 MXN)
Signature date
9 de mayo de 2008
Execution period
9 de mayo de 2008 to Fecha desconocida
Internal award code
193-2007-JCAS-PAPAZU
No data
Date updated in QQW
9 de mayo de 2021
Source(s)
Part of the project
Organization responsible for the import