Total amount
264,635.6 pesos mexicanos
Contract period(s)
Between 10 de julio de 2007 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-38104002-062-07 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
Call title
Frente No. 2 Tercera Etapa Acueducto Presa Situriachi, Instalaciýn de 2,780.75 M.L. de tuberýa de PAD de 18 " de diýmetro; suministro e instalaciýn de 1,114.241 M.L. de tuberýa de acero de 18" de diýmetro calidad API-5L grado X-52 PSL-2, fabricaciýn y montaje de piezas especiales de acero al carbýn de 12" y 18" de diýmetro.
Award title
Construcciýn de obra de agua potable
Contract title
Construcciýn de obra de agua potable
Supplier(s)
Amount
264,635.6 pesos mexicanos
Signature date
10 de julio de 2007
Execution period
10 de julio de 2007 to Fecha desconocida
Internal award code
097-2007-JCAS-HABITA
No data
Date updated in QQW
9 de mayo de 2021
Source(s)
Part of the project
Organization responsible for the import