Total amount
233,429.4 pesos mexicanos
Contract period(s)
Between 12 de julio de 2006 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-38104002-049-06 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
Call title
Construcciýn de la tercera etapa del Colector Simýn Bolývar que consiste en el suministro e instalaciýn de 654.0 m.l. de tuberýa de 61 y 45 cms de diýmetro.
Award title
Construcciýn de obra de agua potable
Contract title
Construcciýn de obra de agua potable
Supplier(s)
Amount
233,429.4 pesos mexicanos
Signature date
12 de julio de 2006
Execution period
12 de julio de 2006 to Fecha desconocida
Internal award code
JCAS-FISE-02-081-200
No data
Date updated in QQW
9 de mayo de 2021
Source(s)
Part of the project
Organization responsible for the import