Total amount
395,701.6 pesos mexicanos
Contract period(s)
Between 14 de septiembre de 2006 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-38104002-021-06 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
Call title
Conclusiýn de la Construcciýn Sistema Lagunar con capacidad instalada de 42 l.p.s. incluye Lýnea de Conducciýn Presesurizada, Conformaciýn de Lagunas, Caja Rompedora de Presiýn y Distribuidora de Gasto, Registros, Pozos de Visita, Tuberýas de Interconexiýn y Obra Complementaria en la localidad de Saucillo, mpio. del M.N., Chih.
Award title
Construcciýn de obra de agua potable
Contract title
Construcciýn de obra de agua potable
Supplier(s)
Amount
395,701.6 pesos mexicanos
Signature date
14 de septiembre de 2006
Execution period
14 de septiembre de 2006 to Fecha desconocida
Internal award code
JCAS-HABITAT-14-063-