Total amount
52,114.1 pesos mexicanos
Contract period(s)
Between 22 de agosto de 2005 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-38104002-017-05 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
Call title
Construcciýn de captaciýn manantial Los Zapotes, rehabilitaciýn de lýnea de conducciýn de 3" de diýmetro, equipo de cloraciýn de bayoneta, tanque de regularizaciýn de mamposterýa de 40 m3 de capacidad, lýnea de alimentaciýn y red de distribuciýn con 2411.57 mts de tuberýa de 3" de PVC RD-41 serie inglesa, 1040.40 mts. de tuberýa de PAD de 2" de diýmetro RD-17 y 26 mts de tuberýa de Fo. Ga. de 2" de diýmetro para la localidad Dolores del municipio de Guadalupe y Calvo, Chih.
Award title
Estudios y proyectos
Contract title
Estudios y proyectos
Amount
52,114.1 pesos mexicanos
Signature date
22 de agosto de 2005
Execution period
22 de agosto de 2005 to Fecha desconocida
Internal award code
JCAS-PROSSAPYS-08-05
No data
Date updated in QQW
9 de mayo de 2021
Source(s)
Part of the project
Organization responsible for the import