Total amount
2.4 millones de pesos mexicanos (2,425,874.43 MXN)
Contract period(s)
Between 9 de marzo de 2004 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-38104002-010-02 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Call title
CONSTRUCCION DEL INTERCEPTOR MARGEN IZQUIERDA_x000D_ "POZO 58 - POZO 61" QUE CONSISTE EN:_x000D_ SUMINISTRO DE TUBERIAS DE 3" Y 8" DE DIAM; MATERIAL PARA TOMAS Y DESCARGAS, VALVULAS, PIEZAS ESPECIALES, BROCALES DE Fo Fo Y MATERIAL DE BANCO PARA RELLENOS, ADEMAS LA CARGA, EL FLETE Y LA DESCARGA DE TUBERIA DE CONCRETO PRETENSADO DE 48" (1220 MM) DE DIAM. , TRAZO DEL PROYECTO RUPTURA Y REPOSICION DEL PAVIMENTO ASFALTICO DE BANQUETAS Y GUARNICIONES , EXCAVACIONES, PLANTILLAS, LA INSTALACION DE 307.00 ML. DE TUBERIA DE CONCRETO PRETENSADO DE 48" (1220 MM) DE DIAM., RELLENOS COMPACTADOS, SUBRASANTE, BASE HIDRAULICA, RETIRO DE ESCOMBRO, ETC. Y LA CONSTRUCCION DE 6 POZOS DE VISITA Y UN DESFOGUE.
Award title
CONSTRUCCION DEL INTERCEPTOR MARGEN IZQUIERDA_x000D_ "POZO 58 - POZO 61" QUE CONSISTE EN:_x000D_ SUMINISTRO DE TUBERIAS DE 3" Y 8" DE DIAM; MATERIAL PARA TOMAS Y DESCARGAS, VALVULAS, PIEZAS ESPECIALES, BROCALES DE Fo Fo Y MATERIAL DE BANCO PARA RELLENOS, ADEMAS LA CARGA, EL FLETE Y LA DESCARGA DE TUBERIA DE CONCRETO PRETENSADO DE 48" (1220 MM) DE DIAM. , TRAZO DEL PROYECTO RUPTURA Y REPOSICION DEL PAVIMENTO ASFALTICO DE BANQUETAS Y GUARNICIONES , EXCAVACIONES, PLANTILLAS, LA INSTALACION DE 307.00 ML. DE TUBERIA DE CONCRETO PRETENSADO DE 48" (1220 MM) DE DIAM., RELLENOS COMPACTADOS, SUBRASANTE, BASE HIDRAULICA, RETIRO DE ESCOMBRO, ETC. Y LA CONSTRUCCION DE 6 POZOS DE VISITA Y UN DESFOGUE.
Contract title
CONSTRUCCION DEL INTERCEPTOR MARGEN IZQUIERDA_x000D_ "POZO 58 - POZO 61" QUE CONSISTE EN:_x000D_ SUMINISTRO DE TUBERIAS DE 3" Y 8" DE DIAM; MATERIAL PARA TOMAS Y DESCARGAS, VALVULAS, PIEZAS ESPECIALES, BROCALES DE Fo Fo Y MATERIAL DE BANCO PARA RELLENOS, ADEMAS LA CARGA, EL FLETE Y LA DESCARGA DE TUBERIA DE CONCRETO PRETENSADO DE 48" (1220 MM) DE DIAM. , TRAZO DEL PROYECTO RUPTURA Y REPOSICION DEL PAVIMENTO ASFALTICO DE BANQUETAS Y GUARNICIONES , EXCAVACIONES, PLANTILLAS, LA INSTALACION DE 307.00 ML. DE TUBERIA DE CONCRETO PRETENSADO DE 48" (1220 MM) DE DIAM., RELLENOS COMPACTADOS, SUBRASANTE, BASE HIDRAULICA, RETIRO DE ESCOMBRO, ETC. Y LA CONSTRUCCION DE 6 POZOS DE VISITA Y UN DESFOGUE.
Supplier(s)
Amount
2.4 millones de pesos mexicanos (2,425,874.43 MXN)
Signature date
9 de marzo de 2004
Execution period
9 de marzo de 2004 to Fecha desconocida
Internal award code
SGC-GRRB-JCAS-002-02
No data
Date updated in QQW
9 de mayo de 2021