Total amount
471,247.3 pesos mexicanos
Contract period(s)
Between 9 de abril de 2002 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-31002003-009-02 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
Call title
BULEVAR JESUS MARIA - SAN ANTONIO DE LOS HORCONES TRAMO LIBRAMIENTO - SAN ANTONIO DE LOS HORCONES
Award title
CONSTRUCCIÓN DE PUENTE PEATONAL EN CARRETERA TORTUGAS - TÚNEL DE POTRERILLOS, FRENTE A TELESECUNDARIA
Contract title
CONSTRUCCIÓN DE PUENTE PEATONAL EN CARRETERA TORTUGAS - TÚNEL DE POTRERILLOS, FRENTE A TELESECUNDARIA
Supplier(s)
Amount
471,247.3 pesos mexicanos
Signature date
9 de abril de 2002
Execution period
9 de abril de 2002 to Fecha desconocida
Internal award code
120-2002-25