Total amount
62.8 millones de pesos mexicanos (62,818,938.86 MXN)
Contract period(s)
Between 25 de abril de 2002 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-18576042-010-02 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
Call title
TERMINACIÓN DE LA INGENIERÍA DE DETALLE, PROCURA DE EQUIPO Y MATERIALES, CONSTRUCCIÓN, PRUEBAS Y PUESTA EN OPERACIÓN DE LA PLANTA HIDRODESULFURADORA DE NAFTAS DE 40,000 BPSD. DE CAPACIDAD, DE LA REFINERÍA "FRANCISCO I. MADERO" EN CD. MADERO, TAMPS.,
Award title
TERMINACION DE TRAMOS PENDIENTES DE CONSTRUCCION DEL NUEVO OLEODUCTO DE 24" DE DIAMETRO NUEVO-TEAPA-POZA RICA-MADERO-CADEREYTA, TRAMOS I Y III (DEL KM. 2+192 AL KM. 116+655 Y DEL KM. 95+739 AL KM. 115+000) Y PRUEBA HIDROSTATICA DEL KM. 0+000 AL KM. 33+400 Y DEL KM. 77+500 AL KM. 120+732 (DEL TRAMO I) Y DEL KM. 82+800 AL KM. 116+160 (DEL TRAMO III).
Contract title
TERMINACION DE TRAMOS PENDIENTES DE CONSTRUCCION DEL NUEVO OLEODUCTO DE 24" DE DIAMETRO NUEVO-TEAPA-POZA RICA-MADERO-CADEREYTA, TRAMOS I Y III (DEL KM. 2+192 AL KM. 116+655 Y DEL KM. 95+739 AL KM. 115+000) Y PRUEBA HIDROSTATICA DEL KM. 0+000 AL KM. 33+400 Y DEL KM. 77+500 AL KM. 120+732 (DEL TRAMO I) Y DEL KM. 82+800 AL KM. 116+160 (DEL TRAMO III).
Supplier(s)
Amount
62.8 millones de pesos mexicanos (62,818,938.86 MXN)
Signature date
25 de abril de 2002
Execution period
25 de abril de 2002 to Fecha desconocida
Internal award code
RSPMC-035/02BMX