TERMINACION DE TRAMOS PENDIENTES DE CONSTRUCCION DEL NUEVO OLEODUCTO DE 24" DE DIAMETRO NUEVO-TEAPA-POZA RICA-MADERO-CADEREYTA, TRAMOS I Y III (DEL KM. 2+192 AL KM. 116+655 Y DEL KM. 95+739 AL KM. 115+000) Y PRUEBA HIDROSTATICA DEL KM. 0+000 AL KM. 33+400 Y DEL KM. 77+500 AL KM. 120+732 (DEL TRAMO I) Y DEL KM. 82+800 AL KM. 116+160 (DEL TRAMO III).

CONTRACT SUMMARY 18576042-010-02-RSPMC-035/02BMX

Total amount

62.8 millones de pesos mexicanos (62,818,938.86 MXN)

Contract period(s)

Between 25 de abril de 2002 and Fecha desconocida

This contract is part of a record. See record ocds-0ud2q6-18576042-010-02 in Open Contracting Data Standard format.

CONTRACT QUALITY

More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.

This contract has not been evaluated.

This contract has not been evaluated.

PLANNING

No data

CALL FOR TENDERS

Call type

Licitación Pública (open)

Scope

Nacional

Purchase type

Obra Publica (works)

Call status

complete

AWARD AND CONTRACT

Call title

TERMINACIÓN DE LA INGENIERÍA DE DETALLE, PROCURA DE EQUIPO Y MATERIALES, CONSTRUCCIÓN, PRUEBAS Y PUESTA EN OPERACIÓN DE LA PLANTA HIDRODESULFURADORA DE NAFTAS DE 40,000 BPSD. DE CAPACIDAD, DE LA REFINERÍA "FRANCISCO I. MADERO" EN CD. MADERO, TAMPS.,

Award title

TERMINACION DE TRAMOS PENDIENTES DE CONSTRUCCION DEL NUEVO OLEODUCTO DE 24" DE DIAMETRO NUEVO-TEAPA-POZA RICA-MADERO-CADEREYTA, TRAMOS I Y III (DEL KM. 2+192 AL KM. 116+655 Y DEL KM. 95+739 AL KM. 115+000) Y PRUEBA HIDROSTATICA DEL KM. 0+000 AL KM. 33+400 Y DEL KM. 77+500 AL KM. 120+732 (DEL TRAMO I) Y DEL KM. 82+800 AL KM. 116+160 (DEL TRAMO III).

Contract title

TERMINACION DE TRAMOS PENDIENTES DE CONSTRUCCION DEL NUEVO OLEODUCTO DE 24" DE DIAMETRO NUEVO-TEAPA-POZA RICA-MADERO-CADEREYTA, TRAMOS I Y III (DEL KM. 2+192 AL KM. 116+655 Y DEL KM. 95+739 AL KM. 115+000) Y PRUEBA HIDROSTATICA DEL KM. 0+000 AL KM. 33+400 Y DEL KM. 77+500 AL KM. 120+732 (DEL TRAMO I) Y DEL KM. 82+800 AL KM. 116+160 (DEL TRAMO III).

Amount

62.8 millones de pesos mexicanos (62,818,938.86 MXN)

Signature date

25 de abril de 2002

Execution period

25 de abril de 2002 to Fecha desconocida

Internal award code

RSPMC-035/02BMX

This contract is (terminated)

IMPLEMENTATION

No data

GENERAL INFORMATION

Date updated in QQW

9 de mayo de 2021

Source(s)

CompraNet 3.0

Part of the project

TodosLosContratos.mx