PROCURA Y CONSTRUCCION DE TRES GASODUCTOS DE B.N. DE 20" DE DIAM. LINEA 19 DE PP--AL-1 HACIA E-KU-A2 , LINEA 20 DE E-KU-A2 HACIA PP-KU-M Y LINEA 24 DE E-KU-A2 HACIA PP-ZAAP-C DEL PROYECTO INTEGRAL KU-MALOOB-ZAAP EN LA SONDA DE CAMPECHE, GOLFO DE MEXICO
CONTRACT SUMMARY 18575106-030-04-PEP-OI-E-331/04
Total amount
771.7 millones de pesos mexicanos (771,713,722.83 MXN)
Contract period(s)
Between 9 de mayo de 2006 and Fecha desconocidaThis contract is part of a record.See record ocds-0ud2q6-18575106-030-04 in Open Contracting Data Standard format.
CONTRACT QUALITY
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
PLANNING
CALL FOR TENDERS
AWARD AND CONTRACT
Call title
PROCURA Y CONSTRUCCION DE TRES GASODUCTOS DE B.N. DE 20" DE DIAM. LINEA 19 DE PP--AL-1 HACIA E-KU-A2 , LINEA 20 DE E-KU-A2 HACIA PP-KU-M Y LINEA 24 DE E-KU-A2 HACIA PP-ZAAP-C DEL PROYECTO INTEGRAL KU-MALOOB-ZAAP EN LA SONDA DE CAMPECHE, GOLFO DE MEXICO
Award title
PROCURA Y CONSTRUCCION DE TRES GASODUCTOS DE B.N. DE 20" DE DIAM. LINEA 19 DE PP--AL-1 HACIA E-KU-A2 , LINEA 20 DE E-KU-A2 HACIA PP-KU-M Y LINEA 24 DE E-KU-A2 HACIA PP-ZAAP-C DEL PROYECTO INTEGRAL KU-MALOOB-ZAAP EN LA SONDA DE CAMPECHE, GOLFO DE MEXICO
Contract title
PROCURA Y CONSTRUCCION DE TRES GASODUCTOS DE B.N. DE 20" DE DIAM. LINEA 19 DE PP--AL-1 HACIA E-KU-A2 , LINEA 20 DE E-KU-A2 HACIA PP-KU-M Y LINEA 24 DE E-KU-A2 HACIA PP-ZAAP-C DEL PROYECTO INTEGRAL KU-MALOOB-ZAAP EN LA SONDA DE CAMPECHE, GOLFO DE MEXICO
Supplier(s)
Amount
771.7 millones de pesos mexicanos (771,713,722.83 MXN)
Signature date
9 de mayo de 2006
Execution period
9 de mayo de 2006 to Fecha desconocida
Internal award code
PEP-OI-E-331/04
IMPLEMENTATION
No data
GENERAL INFORMATION
Date updated in QQW
9 de mayo de 2021
Source(s)
Part of the project
Organization responsible for the import