Total amount
382,630.9 pesos mexicanos
Contract period(s)
Between 10 de marzo de 2008 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-16101044-025-07 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Call title
Supervisiýn de la Construcciýn de 8.8 kilýmetros del camino Colonia Benito Juýrez-Presa Derivadora Paso Sanjuanero y Terminaciýn de camino el Zapote del km. 0+000 al km. 3+500 y construcciýn de estructuras dispersas en la Zona de Riego Ixtepec
Award title
Supervisiýn de la Construcciýn de 8.8 kilýmetros del camino Colonia Benito Juýrez-Presa Derivadora Paso Sanjuanero y Terminaciýn de camino el Zapote del km. 0+000 al km. 3+500 y construcciýn de estructuras dispersas en la Zona de Riego Ixtepec
Contract title
Supervisiýn de la Construcciýn de 8.8 kilýmetros del camino Colonia Benito Juýrez-Presa Derivadora Paso Sanjuanero y Terminaciýn de camino el Zapote del km. 0+000 al km. 3+500 y construcciýn de estructuras dispersas en la Zona de Riego Ixtepec
Supplier(s)
Amount
382,630.9 pesos mexicanos
Signature date
10 de marzo de 2008
Execution period
10 de marzo de 2008 to Fecha desconocida
Internal award code
SGIH-OCPS-OAX-07-149
No data
Date updated in QQW
9 de mayo de 2021
Source(s)
Part of the project
Organization responsible for the import